H. Husniah; " />
Record Detail Back

XML

Game-Theoretic Models for Usage-based Maintenance Contract


Abstract
A usage-based maintenance contracts with coordination and non coordination between two parties is studied in thispaper. The contract is applied to a dump truck operated in
a mining industry. The situation under study is that an agent offers service contract to the owner of the truck after warranty ends. This contract has only a time limit but no usage limit. If thetotal usage per period exceeds the maximum usage allowed in the contract, then theowner will be charged an additional cost. In general, theagent(Original Equipment Manufacturer/OEM) provides a full coverage of maintenance, which includes PM and CM underthe lease contract. The decision problem for theowneris to select the best option offered that fits to its requirement, and the decision problem for theagentistofind the optimal maintenance efforts for a given price of theserviceoption offered. We first find the optimal decisionsusing coordination scheme and then with non coordination schemefor both parties.
H. Husniah - Personal Name
B. P. Iskandar - Personal Name
R. Wangsaputra - Personal Name
A. Cakravastia - Personal Name
658 HEN g
600
Text
English
2018
LOADING LIST...
LOADING LIST...
APA Citation
H. Husniah. (2018).Game-Theoretic Models for Usage-based Maintenance Contract.(Electronic Thesis or Dissertation). Retrieved from https://localhost/etd