<label>hey aku disini show_detail</label><?xml version="1.0" encoding="UTF-8" ?>
<modsCollection xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" xmlns:slims="http://slims.web.id" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-3.xsd">
<mods version="3.3" ID="987">
<titleInfo>
<title>Modelling two-dimensional lease contract with preventive maintenance and servicing strategy</title>
</titleInfo>
<name type="Personal Name" authority="">
<namePart>H. Husniah</namePart>
<role><roleTerm type="text">Primary Author</roleTerm></role>
</name>
<name type="Personal Name" authority="">
<namePart>B. P. Iskandar</namePart>
<role><roleTerm type="text">Primary Author</roleTerm></role>
</name>
<typeOfResource manuscript="yes" collection="yes">mixed material</typeOfResource>
<genre authority="marcgt">bibliography</genre>
<originInfo>
<place><placeTerm type="text"></placeTerm></place>
<publisher></publisher>
<dateIssued>2016</dateIssued>
<issuance>monographic</issuance>
<edition></edition>
</originInfo>
<language>
<languageTerm type="code">en</languageTerm>
<languageTerm type="text">English</languageTerm>
</language>
<physicalDescription>
<form authority="gmd">Text</form>
<extent></extent>
</physicalDescription>
<note>Abstract
In this paper, we study a two-dimensional lease contract with preventive maintenance and servicing strategy involving imperfect repair. The lease contract coverage is characterized by two parameters – age and usage. The lessor will carry out preventive maintenance (PM) and a servicing strategy which allows more than one imperfect repairs under the contract. In the lease contract studied, we consider that a penalty cost incurred when the time required to perform an imperfect repair exceeds a target. This servicing strategy aims to reduce equipment failures and hence decreasing the penalty cost and maintenance cost during the leased contract. We find the optimal PM degree and the imperfect repair strategy such that the expected total cost is minimized. Numerical examples are presented to illustrate the optimal PM and servicing strategy for various usage rates (heavy, moderate and low usage rates), and compared results for this servicing strategy with those of minimal repair strategy.</note>
<subject authority=""><topic>two dimensional leased contract</topic></subject>
<subject authority=""><topic>expected cost</topic></subject>
<subject authority=""><topic>imperfect repair</topic></subject>
<subject authority=""><topic>Servicing strategy</topic></subject>
<classification>600</classification><identifier type="isbn"></identifier><location>
<physicalLocation>Repository Fakultas Teknik Sistem Repository Elektronik Skripsi dan Penelitian Dosen Fakultas Teknik</physicalLocation>
<shelfLocator>658 HEN m</shelfLocator>
<holdingSimple>
<copyInformation>
<numerationAndChronology type="1">JITI.2016.002</numerationAndChronology>
<sublocation>My Library</sublocation>
<shelfLocator>658 HEN m</shelfLocator>
</copyInformation>
</holdingSimple>
</location>
<slims:digitals>
<slims:digital_item id="5334" url="repository/MODELLING TWO-DIMENSIONAL LEASE CONTRACT .pdf" path="/MODELLING TWO-DIMENSIONAL LEASE CONTRACT .pdf" mimetype="application/pdf">MODELLING TWO-DIMENSIONAL LEASE CONTRACT  WITH PREVENTIVE MAINTENANCE AND SERVICING  STRATEGY</slims:digital_item>
</slims:digitals><slims:image>Cover_-_16._Modelling_two-dimensional_lease_contract_with_preventive_maintenance_and_servicing_strat</slims:image>
<recordInfo>
<recordIdentifier>987</recordIdentifier>
<recordCreationDate encoding="w3cdtf">2023-02-01 16:00:04</recordCreationDate>
<recordChangeDate encoding="w3cdtf">2023-03-27 21:19:00</recordChangeDate>
<recordOrigin>machine generated</recordOrigin>
</recordInfo></mods></modsCollection>